Search engine :
Return to the menu
| : /
Vote:
Results:
0 Votes
MARCH 2017 - Volume: 92 - Pages: 214-219
Download pdf
This paper discusses four methods of risk assessment. These methods have been selected based on the ability to better adapt to the characteristics of the construction sector: INSHT, ANACT, RNUR and FINE. They have been applied to three building constructions of different features. In each construction work, three high accident phases were analyzed: structure, façades and roofs. The research studies 10 working risks, classified according to the technique used against that particular risk, that is: safety at work (4), (2) industrial hygiene, ergonomics (2) and (2) applied psychology. Results show that there are very significant differences in terms of risk types and levels of risk that each method is capable of signaling, depending on the type of work analyzed.Keywords: Prevention; safety at work; methodology; risk assessment; construction
Share:
© Engineering Journal Dyna 2025 - UK Zhende Publishing Limited
Address: Unit 7 Wilsons Business Park, Manchester M40 8WN United Kingdom
Email: office@revistadyna.com
Regístrese en un paso con su email y podrá personalizar sus preferencias mediante su perfil
Name: *
Surname 1: *
Surname 2:
Email: *