Search engine :
Return to the menu
22 Feb 2021
News
Vote:
Results:
1 Votes
In this engineering news we published in January of last 2020 (https://www.revistadyna.com/noticias-de-ingenieria/el-tamano-si-que-importa) how the main builders of the so-called wind turbines reached increasing rated powers, reaching up to 12 MW of nominal power that, throughout the year and by some manufacturer, was approaching 14 MW under certain design and installation conditions.
Share:
WIND TURBINES REACH 15 MW WHEN 20 MW?
Chanel. Best Practices
© Engineering Journal Dyna 2006 - Publicaciones Dyna, S.L
Official Science and Technology Body of the Federation of Industrial Engineers' Associations
Address: Unit 1804 South Bank Tower, 55 Upper Ground, London UK, SE1 9EY
Email: office@revistadyna.com
Regístrese en un paso con su email y podrá personalizar sus preferencias mediante su perfil
Name: *
Surname 1: *
Surname 2:
Email: *